00.cn--> How to do the installation and maintenance of oral liquid filling production line-To accompany others-Shanghai Sheng Guan Machinery Co., Ltd.-
Productsearch:
To accompany others NEWS
Your present location:localHome > News Center > To accompany others

How to do the installation and maintenance of oral liquid filling production line

Date:2018/9/12 8:17:14

Oral liquid filling production line When the moving tooth plate moves the bottle to the position of the filling liquid of the filling liquid, the convex surface of the cam 7 is separated from the swinging plate 6, and the swinging plate 6 is pulled by the tension spring 4 to swing clockwise, and the swinging plate 6, the pressure bottle stopper 2 is moved downward until it contacts the bottle 3. At this time, the wire rolling head 5 swinging plate 6 should be adjusted to contact and the adjusting screw 8 is adjusted to extend the ejector pin 1 by about 4 mm. An empty bottle appears, and the pressure bottle plug 2 and the rocking plate 6 continue to move downward due to the action of the tension spring 4, so that the wire rolling head 5 pulls the steel wire to disengage the ejector pin 1 from the ejector pin 9, so that the applicator cannot be driven to work, and the perfusion medicine is automatically stopped. liquid

      The oral liquid filling machine is an automatic machine, so the size of the bottle, the bottle pad and the cap are required to be uniform. You must first use the rocker to turn the machine to see if it is abnormal, and you can drive it after you know it is normal.

      When adjusting the machine, the tool should be used properly. It is strictly forbidden to use excessive tools or excessive force to remove parts to avoid damage to the machine or affect the performance of the machine. Whenever the machine is adjusted, one must actually tighten the loose screws, and use the rocker to turn the machine to see if it meets the requirements. Note when adjusting the lock: After adjusting the various departments, you must pay attention to the lock of each nut. When the initial valve is tested, use the easy-pull bottle. The average height must be taken. Irregular easy-pull bottles cannot enter the lock to avoid damage to the parts.


TypeInfo: To accompany others

Home  |  Message  |  Contact Us
CopyRight©2018 Shanghai Sheng Guan Machinery Co., Ltd  TEL:021-69176088 The content of this website is not allowed to be stolen or reproduced without  

沪ICP备10213035号-1